Ɛsɛ sɛ wɔde ahoɔden a wɔkora so nhyehyɛe a ɛgyina hɔ pintinn di dwuma bere a ahoɔden a wɔyɛ no foforo a ɛkɔ mu no boro 40%, wɔ mmere a nsɛnnennen a ɛho hia kɛse wɔ ahwehwɛde a ɛsen biara mu, anaasɛ bere a wontumi mfa awo ntoatoaso a wɔtaa yɛ nkutoo so nni grid a ɛyɛ mmerɛw ho ahwehwɛde ahorow ho dwuma. Bere a eye sen biara a wɔde bɛyɛ ahoɔden a wɔkora so nhyehyɛe a egyina hɔ pintinn no gyina ahoɔden a wɔde yɛ foforo a wɔde bɛka abom no dodow, sikasɛm mu mfaso, ne grid service ahiade pɔtee so.

Ahoɔden a Wɔyɛ Foforo a Wɔde Bɛka Abom
Abusuabɔ a ɛda ahoɔden foforo a wɔde hyɛ mu ne nneɛma a wɔkora so a wɔde di dwuma ntam no di nhyehyɛe ahorow a wotumi hyɛ ho nkɔm akyi. Nhyehyɛeɛ a ɛwɔ ahoɔden foforɔ a ɛtumi sesa nnu 40% no taa hwehwɛ berɛ tiawa-akoraeɛ ano aduru nko ara, titire no ma frequency regulation ne operating reserves. Nhwehwɛmu a ɛfiri NREL Storage Futures Study mu kyerɛ sɛ saa mfitiaseɛ-stage grids yi tumi di nsakraeɛ ho dwuma denam awoɔ ntoatoasoɔ a ɛyɛ mmerɛw ne ahwehwɛdeɛ mmuaeɛ nhyehyɛeɛ a ɛwɔ hɔ dada no so.
Sɛ renewable penetration du 40-80% a, hia a ɛhia sɛ wɔkora nneɛma a ɛwɔ medium-bere mu no bɛyɛ nea ɛho hia kɛse. Saa bere yi de, owia ne mframa a ɛkɔ so da biara da no ma nsakrae a ɛda adi kɛse wɔ nea wɔhwehwɛ no mu. California ne Texas yɛ nsakrae yi ho nhwɛso-mprempren aman abien no nyinaa de nnɔnhwerew 4 batere nhyehyɛe a ɛho hia di dwuma de di awiabere owia ahoɔden kwan ne anwummere ahwehwɛde a ɛsen biara ho dwuma. "Duck curve" adeyɛ no, baabi a adesoa a ɛwɔ asau no so tew kɛse wɔ awiabere owia awo ntoatoaso mu na ɛkɔ soro anwummere no, ma wonya ɔkwan a eye sen biara a wɔfa so de di dwuma ma nnɔnhwerew 2-6 nneɛma a wɔkora so nhyehyɛe ahorow.
Sɛ ɛboro 80% a wɔtumi hyɛn mu foforɔ a, grids hwehwɛ sɛ wɔde nneɛma a wɔde sie a ɛyɛ medium ne long-bere tenten afrafra. DOE’s Long Duration Storage Pathways amanneɛbɔ kyerɛ sɛ ebedu afe 2050 no, net-zero scenarios a wɔde bere tenten -bere tenten ahoɔden a wɔkora so di dwuma no betumi akora $10{9}}20 ɔpepepem afe biara wɔ adwumayɛ ho ka mu sɛ wɔde toto akwan a enni storage ho a. Nhyehyɛe ahorow a etumi de nnɔnhwerew 10+ gu nsu mu no bɛyɛ nea ɛho hia ma wim tebea a ɛkɔ so nna pii ne mmere mu nsakrae.
Sikasɛm mu Nkɔsoɔ Ho Nsɛnkyerɛnneɛ
Ka a wɔtew so akwan horow no nya bere a eye sen biara a wɔde bedi dwuma ama ahoɔden a wɔkora so nhyehyɛe ahorow a egyina hɔ no so nkɛntɛnso tẽẽ. Battery a wɔkora so ho ka kɔɔ fam 40% wɔ afe 2024 mu koduu wiase nyinaa sɛ ɛyɛ $165/kWh ma turnkey systems, sɛnea BloombergNEF kyerɛ no. China nyaa $100/kWh anohyeto no nea edi kan, a nnɔnhwerew 4- nhyehyɛe ahorow no yɛ $85/kWh. Eyi gyina hɔ ma nsakrae titiriw a ɛma nneɛma a wɔkora so no bɛyɛ nea ɛho ka yɛ den wɔ atetesɛm mu tumi a ɛkɔ soro sen biara wɔ gua pii so no ho.
Ɛsono ɛka a wɔbɔ wɔ nneɛma a wɔkora so ho a wɔahyɛ no pɛpɛɛpɛ wɔ mfiridwuma ne bere tenten a wɔde di dwuma no mu. Lithium-ion battery mprempren nya LCOS a ɛyɛ $120-180 EUR/MWh a ɛwɔ 90-95% akwantuo a ɛkɔ ne baabi a ɛyɛ yie, na ɛma ɛyɛ papa ma dwumadie a ɛhia sɛ wɔde sie nnɔnhwereɛ 2-6. Lead-acid batteries, bere a ne bo yɛ mmerɛw upfront, kyerɛ anohyeto cycle nkwa ne efficiency a ɛba fam wɔ 75-80%. Hydrogen nhyehyɛe ahorow no da so ara bo yɛ den bɛboro $250 EUR/MWh nanso ɛma mfaso horow ma bere a wɔde sie nneɛma.
Project sikasɛm tu mpɔn kɛseɛ denam value stacking-a ɛma storage ma kwan ma wɔde grid dwumadie ahodoɔ ma bere koro mu. Nhyehyɛe a ɛma tumi a ɛkorɔn, frequency regulation, ne energy arbitrage ma wonya sika a ɛkɔ soro kɛse sen ɔsom adwuma biako-deployments. Guadidan ahorow a wɔayɛ no yiye -akatua akwan a wɔfa so tua tumi, nnwuma a ɛboa, ne ahoɔden bere-sesa no ma tebea horow a eye kɛse ma bere a ɛbɛn -de di dwuma.
Grid Service Ahwehwɛde ahorow
Grid dwumadie ahodoɔ na ɛma wɔde di dwuma wɔ nhyehyɛeɛ no nkɔsoɔ mmerɛ ahodoɔ mu. Frequency regulation ne operating reserves taa ma ɛfata sɛ wɔde ahoɔden a wɔkora so nhyehyɛe ahorow a enhinhim sisi hɔ ntɛm. Saa dwumadie tiawa-kyinhyia a ɛkorɔn-kyinhyia dwumadie yi de sika di dwuma wɔ storage no mmuaeɛ ntɛmntɛm tumi-dannan firi standby kɔ delivery a ɛdi mũ wɔ miliseconds mu. Nsupɔw so nhama ne akyirikyiri nhyehyɛe ahorow a nkitahodi kakraa bi na ɛwɔ mu no nya mfaso titiriw fi saa ahotoso nnwuma yi mu.
Peak shaving applications bɛyɛ sikasɛm mu anigye bere a nsonsonoe a ɛda peak ne average demand ntam no ma tumi ho ka kɛse ba. Systems a ɛwɔ peak demand bere a ɛyɛ nnɔnhwerew 4-6 no hu adwumayɛ ho asɛm a emu yɛ den sen biara ma deployment. Nhwehwɛmu a efi mmeae pii kyerɛ sɛ nnɔnhwerew 4-batere betumi ama ahoɔden a ɛkorɔn bosea wɔ nnɛyi awɔw bere mu-peaking nhyehyɛe ahorow mu, wɔ ɔkwan a etu mpɔn so de asi amanne fossil-fueled peaking tumi ananmu.
Ahoɔden berɛ-sesa mfasoɔ boɔ sɛ awoɔ ntoatoasoɔ a wɔyɛ foforɔ no ma ɛboɔ a ɛsakra kɛseɛ. Mpɔtam a owia ahoɔden kɔ mu kɛse no nya awiabere nneɛma bo a ɛba fam (ɛtɔ mmere bi a enye) na anwummere nneɛma bo kɔ soro. Storage charging wɔ low-boɔ mmerɛ mu ne disharging wɔ high-bo windows mu no ma arbitrage sika ba. Botae ho nyansahyɛ no mu yɛ den bere a wɔde nneɛma foforo a wɔde di dwuma no kɔ soro-owia ahoɔden pii kyerɛ sɛ bo mu nsonsonoe a emu dɔ ne bo a ɛsom wɔ nneɛma a wɔkora so kɛse.
Transmission ne distribution deferral gyina hɔ ma deployment trigger foforo. Sɛ grid a ɛyɛ kyenkyenee no de ahotoso to asiane mu anaasɛ ɛhia sɛ wɔyɛ nneɛma a wɔde yɛ adwuma a ne bo yɛ den a, nneɛma a wɔkora so a wɔde asie wɔ ɔkwan pa so no betumi atwe sika a wɔde bɛto mu yi akɔ akyiri anaasɛ wɔayi afi hɔ. Downstream deployment di mpɔtam hɔ ahwehwɛde a ɛsen biara ho dwuma a enhia sɛ wɔde tumi foforo a wɔde fa nneɛma kɔ, na ɛde mfiridwuma ne sikasɛm mu mfaso nyinaa ma.
Deployment Readiness Nhwehwɛmu a Wɔyɛ
Ɛsɛ sɛ ahyehyɛde ahorow a wɔrehwɛ sɛnea wɔde nneɛma a wɔkora so no di dwuma no yɛ nhwehwɛmu a wɔahyehyɛ no yiye wɔ afã horow pii mu. Load profile analysis kyerɛ peak demand nhyehyɛe ne bere tenten. Nneɛma a ɛwɔ mmepɔw a ɛyɛ nnam, a wotumi hyɛ ho nkɔm a ɛyɛ nnɔnhwerew 2-6 no de wɔn a wɔpɛ sɛ wɔkora nneɛma so a wɔyɛ den ma. Ɛsɛ sɛ wɔhwehwɛ abakɔsɛm mu adesoa ho nsɛm mu hwɛ mmere nhyehyɛe, dapɛn da-dapɛn awiei nsakrae, ne nkɔso a ɛkɔ so.
Ɛsɛ sɛ wɔyɛ awoɔ ntoatoasoɔ a wɔtumi yɛ foforɔ no ho mfonini de toto adesoa ho nsɛm ho de hunu hokwan a ɛwɔ hɔ sɛ wɔbɛkora nneɛma so. Mmeae a owia ahoɔden a wɔde di dwuma kɛse no nya awiabere awo ntoatoaso a ɛboro so ne anwummere a ɛho hia-ananse curve tebea a wɔtaa de di dwuma a adekorabea di ho dwuma yiye no mu osuahu. Mframa-mpɔtam a emu yɛ duru betumi akyerɛ nhwɛso ahorow a ɛhwehwɛ sɛ wɔyɛ nhyehyɛe foforo a wɔde sie.
Grid service value quantification hwehwɛ sɛ wɔte mpɔtam hɔ gua nhyehyɛe ase. Guadidan a wɔahyehyɛ a wɔtɔn nneɛma akɛse a ɛwɔ bo ho nsɛnkyerɛnne a emu da hɔ ma tumi, ahoɔden, ne nnwuma a ɛboa no ma wonya bo a ɛyɛ tẽẽ sen nnwumakuw a wɔde nneɛma a wɔde di dwuma a wɔaka abom tẽẽ. Nnansa yi nsɛm a ɛfiri CAISO ne ERCOT kyerɛ sɛ sɛ wɔkyekyɛ mu a, tumi a wɔtua no yɛ $50-75 wɔ kW biara mu afe biara, a ahoɔden arbitrage de mfasoɔ foforɔ kɛseɛ ka ho wɔ mmeaeɛ a wɔtumi kɔ mu kɛseɛ.
Mmara ne nhyehyeɛ nhyehyeɛ nya bere a wɔde bedi dwuma no so nkɛntɛnsoɔ kɛseɛ. Atumfoɔ a wɔwɔ toɔ a wɔde tua sika a wɔde asie, akwan a wɔfa so tua tumi, anaa sikakorabea gyinapɛn a wɔtumi yɛ foforɔ no ma tebea pa ba. U.S. Inflation Reduction Act no tow a wɔde tua sika a wɔde asie wɔ nneɛma a wɔkora so a egyina hɔ ma ne ho no ama wɔde adi dwuma ntɛmntɛm kɛse. Nea ɛne no bɔ abira no, gua ahorow a enni akwan a emu da hɔ a wɔfa so tua nneɛma a wɔkora so anaasɛ wɔde anohyeto a ɛfa nkitahodi ho ahwehwɛde ahorow to hɔ no de akwanside ahorow ba bere a ɛbɛn -bere a wɔde bedi dwuma no mu.

Mfiridwuma ho Nneɛma a Wɔpaw Ho Nsusuwii
Bere tenten a wɔhwehwɛ no ma mfiridwuma ho nimdeɛ a wɔpaw no kyerɛ tẽẽ. Nnwuma a ɛhwehwɛ sɛ wɔde nnɔnhwerew 2-4 gu mu da biara da no ne lithium-ion solutions hyia yiye, titiriw lithium iron phosphate chemistry a ɛhyɛ ahoɔden a wɔkora so nhyehyɛe a egyina hɔ so. Saa nhyehyɛe yi ma ahoɔden a ɛkorɔn, 85-95% akwantuo a ɛkɔ ne baabi a ɛyɛ yie, ne 3,000-8,000 kyinhyia nkwa nna. Mfiridwuma no modularity ma wotumi yɛ nsakrae wɔ sizing ne tẽẽ installation.
Nnɔnhwerew asia kosi awotwe-ahwehwɛde no kɔ so hyɛ lithium-ion tumi mu bere a ɛka so tew na wɔn a wɔyɛ no yɛ nea eye sen biara ma ahoɔden a wɔkora so nhyehyɛe a egyina hɔ pintinn no. Nnwuma a ɛwɔ UK, Australia, Canada, ne Japan no tɔ nnɔnhwerew 6{4}}8 nhyehyɛe denam nhyehyɛe ahorow a wɔde wɔn ani si bere tenten-bere tenten a wɔkora so so. Saa lithium-ion nnwuma a ɛkyɛ-bere tenten yi ne mfiridwuma a ɛkyɛ a ɛreba no si akan wɔ ɛka ne adwumayɛ a wɔada no adi nyinaa ho.
Ɛsɛ sɛ application ahorow a ɛboro nnɔnhwerew 10 susuw mfiridwuma foforo ho. Flow battery, titiriw vanadium redox nhyehyɛe, ma mfe 25-30 adwumayɛ a adwumayɛ nsɛe. Wiase nyinaa vanadium flow battery a ɛso sen biara, a wɔde dii dwuma wɔ China wɔ afe 2022 mu a ɛyɛ 100 MW/400 MWh, kyerɛ mfasoɔ-scale viability. Mframa a wɔahyɛ no den ahoɔden a wɔkora so, nsu a wɔde pɔmpɛ, ne mfiridwuma a ɛreba te sɛ nsu CO2 anaa dade-mframa batere de wɔn ani si nna pii so kosi bere mu nneɛma a wɔkora so ahiade so.
Nneɛma a wɔde ma no tebea nya mfiridwuma a ɛwɔ hɔ ne ne bo so nkɛntɛnso. Chinafoɔ a wɔyɛ nneɛma no di lithium-ion a wɔyɛ so, titire LFP nkwammoaa, na ɛde ɛka a wɔbɔ ne mmerɛwyɛ a ɛbɛtumi aba wɔ nneɛma a wɔde ma mu no nyinaa ba. U.S. ne Europa fie mu nneɛma a wɔyɛ no botaeɛ ne sɛ wɔbɛkyekyere mpɔtam hɔ nneɛma a wɔde ma nanso mprempren wɔyɛ adwuma wɔ 20-30% ɛka a wɔbɔ. Aguadi ho nhyehyɛe ne tow a wɔbɔ no nya ɛka a wɔde ma wɔ gua ahorow so no so nkɛntɛnso kɛse.
Guadibea Bere Ho Nsɛnkyerɛnne
Nsɛnkyerɛnneɛ dodoɔ bi kyerɛ sɛ wɔbɛn -bere a wɔde bɛdi dwuma mfɛnsere a ɛyɛ papa. Wholesale anyinam ahoɔden bo a ɛsakra boro $50/MWh wɔ peak ne off{3}}peak bere ntam no de arbitrage hokwan ahorow a ɛfata sɛ wɔde sika a wɔde sie nneɛma mu ba. Ɛsɛ sɛ abakɔsɛm mu nneɛma bo ho nsɛm kyerɛ nhyehyɛe a ɛkɔ so daa sen sɛ ɛbɛkɔ soro a atew ne ho na ama wɔahwɛ ahu sɛ wobenya sika a wotumi de ho to so.
Tumi gua so nsɛnkyerɛnne wɔ gua ahorow a wɔahyehyɛ mu kyerɛ sɛ wɔasiesie wɔn ho sɛ wɔde bedi dwuma. Mpɔtam a tumi boɔ boro $100/kW-afe ne clearing boɔ a ɛkyerɛ sɛ ɛrekɔ soro no kyerɛ sɛ nneɛma a wɔde ma{3}}ahwehwɛdeɛ a ɛkari pɛ a ɛyɛ den a adekorabea bɛtumi adi ho dwuma. Nea ɛne no bɔ abira no, ebia gua ahorow a ɛwɔ tumi a wɔtaa de di dwuma boro so na ne bo a ɛba fam a wɔde yi nneɛma fi hɔ no nnya nkyerɛɛ nea ɛfata sɛ wɔde nneɛma a wɔkora so no di dwuma wɔ tumi bo nkutoo so.
Renewable curtailment data de sɛnkyerɛnne titiriw foforo ma. Awoɔ ntoatoasoɔ a wɔtumi yɛ foforɔ a wɔtew so kɛseɛ-ɛtaa boro 5% wɔ nneɛma a ɛbɛtumi aba mu-kyerɛ sɛ nneɛma a wɔde ma boro so tebea a akoraeɛ bɛtumi akyere. California tew ahoɔden a wɔyɛ no foforo bɛboro 2,000 GWh so wɔ afe 2023 mu, a egyina hɔ ma hokwan kɛse a ebetumi aba sɛ wɔbɛbɔ ka wɔ nneɛma a wɔkora so ho.
Interconnection queue data da gua so nkɔso adi. Nnwuma akɛse a wɔahyɛ ho nyansa sɛ wɔbɛyɛ de akora nneɛma so no kyerɛ sɛ gua so tebea ye na wɔn a wɔreyɛ no wɔ ahotoso. U.S. nkitahodi ntonto no boroo 400 GW a wɔahyɛ ho nyansa sɛ wɔbɛkora so wɔ afe 2024 awiei, a ɛkyerɛ sɛ nkɔso a ɛbɛkɔ so ahwɛ kwan. Mpɔtam hɔ a wɔde wɔn adwene si aman pɔtee bi mu anaasɛ wɔn a wɔyɛ grid so no kyerɛ baabi a tebea horow no pɛ sɛ wɔde di dwuma kɛse.
Ahwehwɛde a Ɛfa Ahosiesie a Wɔde Yɛ Adwumayɛ Ho
Sɛ wɔde ahoɔden a wɔkora so nhyehyɛe ahorow a egyina hɔ di dwuma yiye a, ɛhwehwɛ sɛ wonya tumi a wɔde yɛ adwuma a ɛboro hardware a wɔde besisi so. Ɛsɛ sɛ ahoɔden sohwɛ nhyehyɛe ahorow no ne grid nhyehyɛe ne gua so kyɛfa a ɛwɔ hɔ dedaw no bom. Ɛsɛ sɛ software nhyehyɛe ahorow di automated bidding wɔ wholesale gua ahorow, real-bere dispatch optimization, ne adwumayɛ sohwɛ ho dwuma. Ɛsɛ sɛ ahyehyɛde ahorow a wonni saa tumi ahorow yi hwehwɛ nnipa a wɔto so abiɛsa-party aggregation services anaasɛ turnkey adwumayɛ ne nsiesie apam ahorow mu.
Adwumayɛfo tumi ho hia kɛse. Mfiridwuma dodow no ara a wɔde sie bere tenten-fa mfiridwuma ne adansi-a wɔde di dwuma kɛse ho. Ɛsɛ sɛ anyinam ahoɔden adwumayɛfoɔ te ahoɔden a ɛkorɔn-voltage nhyehyɛeɛ, batere ahobanbɔ nhyehyɛeɛ, ne grid nkitahodiɛ ahwehwɛdeɛ ase. Ɛsɛ sɛ ahyehyɛde ahorow no hwehwɛ emu tumi ne mpɔtam hɔ adwumayɛfo a wɔwɔ hɔ ansa na wɔahyɛ bɔ sɛ wɔde bere nhyehyɛe a wɔde bɛyɛ adwuma no bɛyɛ adwuma.
Ogya ahobanbɔ ne asiane ho nhyehyɛe ahorow anya din wɔ nsɛm a esisii a ɛkorɔn-nsɛm akyi. California mmarahyɛfo susuw ahwehwɛde ahorow a emu yɛ den kɛse a ɛfa batere a wɔde bɛhyɛ mu ho. Ɛsɛ sɛ nhyehyɛe ahorow no de nnwinnade a ɛfata a wɔde siw ogya ano, nhyehyɛe ahorow a wɔde hwɛ ɔhyew so, ne nhyehyɛe ahorow a wɔde di dwuma ntɛm ara ka ho. Saa ahobammɔ ho nsusuwii ahorow yi de ɛka ka ho nanso ɛda so ara ho hia ma adwumayɛ a wotumi de ho to so na ahobammɔ wom.
Adwumayɛ sohwɛ ne optimization tumi na ɛkyerɛ sɛ ebia nhyehyɛe ahorow no de mfaso a wɔhwɛ kwan no ma anaa. Bere ankasa -bere a wɔhwɛ so hwɛ tebea a wɔbɔ ka, akwantuo a ɛkɔ baabiara, akwantuo a ɛkɔ baabiara, ɔsɛeɛ dodoɔ, ne dwumadie a wɔde ma no ma wotumi di dwuma a wɔyɛ no ntɛm. Nhyehyɛeɛ a ɛkɔ anim de mfiri adesua algorithms di dwuma ma real-bere optimization, maximizing arbitrage hokwan bere a wɔhwɛ degradation.
Ɔmantam no mu Nneɛma a Wɔde Di Dwuma Nhwɛsode
Bere a wɔde di dwuma no gu ahorow kɛse wɔ wiase nyinaa gua ahorow so. China di anim wɔ wiase nyinaa nneɛma a wɔde ka ho bɛboro 50%, a mfiase no na ɛnam ahyɛde ahorow a ɛhwehwɛ sɛ wɔkora nneɛma so a wɔde abɔ mu ne nnwuma a wɔyɛ no foforo. Nnansa yi nhyehyɛe mu nsakraeɛ a ɛkɔ gua-driven deployment so no kyerɛ sɛ onyin fi installations a wɔboa kɔ sikasɛm mu mfasoɔ so. Amansin mu akatua nhyehyɛe ne gua a wɔde fi gua so no ma wonya sika a wonya a ɛboa nkɔso a ɛkɔ so.
United States kyerɛ sɛ wɔde wɔn ho ahyɛ mu wɔ Texas ne California, a wɔaka abom a ɛboro 60% wɔ nneɛma a wɔde besisi hɔ no mu. Texas nya mfaso fi akansi kɛse gua ahorow a ne bo yɛ nsakrae kɛse, bere a California di anwummere akwan a ɛso yɛ toro ho dwuma bere a owia ahoɔden a ɛkɔ mu no boro 30%. Nnansa yi ntrɛwmu a wɔatrɛw akɔ New Mexico, Oregon, ne Arizona no kyerɛ sɛ asasesin ahorow a ɛsono emu biara bere a mpɔtam pii reyɛ nneɛma a wɔde yɛ foforo a ɛyɛ den no.
Europa gua ahorow da dwumadi a ɛrenya nkɔanim adi ɛmfa ho sɛ mmara mu apaapae no. UK, Germany, ne Italy di anim wɔ deployments, a wɔde capacity auctions ne ancillary service gua ahorow boa. European Commission nyansahyɛ ahorow a efi afe 2023 mu no kyerɛ nhyehyɛe mu nneyɛe a ɛhyɛ nneɛma a wɔkora so kɛse a wɔde bedi dwuma ho nkuran, na ɛkyerɛ sɛ wɔbɛkɔ so anya gua so nkɔso.
India ne gua afoforo a ɛrenya nkɔso da nkɔso akwan horow a ɛkɔ so ntɛmntɛm adi. India de tender 45 GWh a ɛyɛ battery akoraeɛ tumi wɔ afe 2024 nko ara mu, a nsusuiɛ bɛboro 100 GWh a ɛyɛ standalone stationary energy storage systems wɔ afe 2030. Aban{5}}aboa tenders a ɛde mfeɛ 12-15 fixed-fee contracts ma no brɛ developer asiane ase na ɛma sikasɛm tumi yɛ yie.
Nsɛm a Wɔtaa Bisa
Ahoɔden a wɔyɛ no foforo dodow ahe na ɛsɛ sɛ wɔde si hɔ ansa na ɛho abehia sɛ wɔkora so?
Nneɛma a wɔkora so ma mfasoɔ wɔ ahoɔden a wɔde hyɛ mu foforɔ biara mu, nanso sikasɛm mu ahiadeɛ taa pue wɔ ahoɔden a wɔyɛ no foforɔ kyɛfa 40-60% ntam. Wɔ 40% ase no, grids taa tumi di nsakraeɛ ho dwuma denam awoɔ ntoatoasoɔ a wɔtaa yɛ a ɛyɛ mmerɛw so. Wɔ saa aboboano yi so no, ɛka a wɔbɔ wɔ nsakrae a wɔyɛ no foforo a wɔhwɛ so denam tew so anaasɛ tumi a wɔtaa de di dwuma boro so a wɔbɛkɔ so akura mu no taa boro ɛka a wɔbɔ wɔ nneɛma a wɔkora so ho.
Bere tenten bɛn na wɔde sie a ntease wom ma application dodow no ara?
Nnɔnhwerew anan-nnɔnhwerew ahoɔden a wɔkora so nhyehyɛe a egyina hɔ no di dwuma mprempren, a egyina hɔ ma bɛboro 70% wɔ nneɛma foforo a wɔde si hɔ wɔ wiase nyinaa. Saa bere tenten yi di awia-kɔ-anwummere adesoa a ɛsakra wɔ owia-grids a emu yɛ duru mu ho dwuma yiye bere a ɛkura ɛka a ɛfata mu. Ɛsɛ sɛ dwumadie a ɛhwehwɛ sɛ ɛkyɛ no yie hwehwɛ dwumadie pɔtee bi mu, ɛfiri sɛ ɛka kɔ soro non-linearly ne berɛ tenten.
So storage deployment betumi atwɛn kosi sɛ renewable penetration bɛkɔ soro?
Sɛ wɔde di kan de di dwuma a, ɛma wonya mfaso pii ɛmfa ho sɛ ɛka a wɔbɔ no kɔ so so tew no. First-mover projects nya adwumayɛ mu osuahu ne mmara ho nimdeɛ. Nneɛma a wɔkora so ma mfasoɔ a ɛwɔ hɔ ntɛm ara denam sika a wɔnya pii a ɛboro nkabom a wɔtumi yɛ foforɔ so, a mpɛn dodoɔ ho mmara ne tumi dwumadie ka ho. Guadi a ɛyɛ ma wɔ saa nnwuma yi ho no ba nkakrankakra, na ɛma wɔn a wɔba ntɛm no tua wɔn ka.
Mɛyɛ dɛn ahu sɛ me facility anaa grid no ayɛ krado sɛ wɔde besie?
Yɛ anammɔn mmiɛnsa-nhwehwɛmu: hwehwɛ adesoa nhyehyɛeɛ mu ma ahwehwɛdeɛ a ɛsen biara su, kyerɛ dodoɔ a ɛwɔ hɔ a wɔde yɛ foforɔ anaa grid dwumadie hokwan, na yɛ sikasɛm mu mfasoɔ ho nhwɛsoɔ a egyina mpɔtam hɔ gua nhyehyɛeɛ so. Sɛ ahwehwɛdeɛ a ɛsen biara boro 50% wɔ nnɔnhwereɛ 2-6 mfɛnsere mu, wɔtew nneɛma a wɔyɛ no foforɔ so daa, anaasɛ tumi a wɔtua boro $75/kW-afe a, ɛbɛyɛ sɛ nneɛma a wɔkora soɔ no ma ɛfata sɛ wɔyɛ nhwehwɛmu a ɛkɔ akyiri a ɛfa sɛdeɛ ɛbɛyɛ yie ho.
Ɛka a ɛrekɔ fam, ahoɔden a wɔde yɛ foforo a ɛrekɔ soro, ne gua so nhyehyɛe a ɛretu mpɔn no ntam nkitahodi ma tebea horow a eye kɛse ma ahoɔden a wɔde sie a enhinhim a wɔde bedi dwuma. Ɛsɛ sɛ ahyehyɛde ahorow susuw tebea pɔtee bi ho de gyina nhyehyɛe ahorow yi so sen sɛ wɔbɛtwɛn tebea horow a edi mũ. 2024 ɛka kwan ne 2025 gua so nkɔsoɔ ho nsusuiɛ kyerɛ sɛ mprempren berɛ no gyina hɔ ma mfɛnsere a ɛyɛ den a wɔde bɛdi dwuma ama dwumadie bebree.
Deployment nkonimdi nnyina bere a edi mũ so kɛse sen ahosiesie a edi mũ-grid ahiade a wɔbɛte ase, mfiridwuma a ɛfata a wɔbɛpaw, ne adwumayɛ tumi a wɔde besi hɔ. Ɛsɛ sɛ gua ahorow a wɔwɔ botae ho nsusuwii a emu da hɔ ne ahyehyɛde ahorow a wɔwɔ tumi a ɛfata no kɔ so de di dwuma. Wɔn a wɔwɔ gua a ɛrenya nkɔso anaasɛ wonni ahoboa a wɔde bɛyɛ adwuma no betumi anya mfaso afi nnwuma a wɔde bɛsɔ ahwɛ mu bere a wɔresi nnwuma ne osuahu a ɛho hia no.